Location: Allerton
Cost: £280,000
Finished on Budget?: Yes
Construction Time: 3 Months
Completed on Time?: Yes
To design & build a wine bar within an existing retail shop. To manage the construction including all health and safety and the party wall act.
Drawings
Architectural Drawings Architectural Drawings